Webinar Events
Join us for a live webinar:
An Introduction to ScrumWorks Pro

Wed, Jan 7, 2009
10:00 AM - 11:00 AM PST
Sign up online »

Team members in Scrum

Thur, Jan 8, 2009
11:00 AM - 11:45 AM PST
Sign up online »

Default Site Image
Submitted by Dan Rawsthorne on June 23, 2008 - 11:37am.

MJ states, above, that the team's job is to produce an increment of potentially shippable product every sprint. This is the party line, and I believe it, but I get lots of questions about what potentially shippable product means. It does not mean shippable, as that is way too high a bar. We develop stories (PBIs), that combine to produce shippable features - it makes no sense for a story to be shippable by itself, IMHO.

What we mean is, if the feature is shippable (from a functionality perspective), then each of the stories that makes up the feature is shippable (from a quality perspective). So, stories that are done have the quality they need to be able to ship them, which means that the feature they are part of can be shipped as soon as it is functional - no waiting time to add in the quality! The way I refer to this is that the stories are demonstrably done every sprint.

Same concept, different words.

Dan ;-)

dan@danube.com
Dan Rawsthorne, PhD, CST
Transformation Coach
http://www.danube.com

Reply

The content of this field is kept private and will not be shown publicly.
  • Allowed HTML tags: <a> <em> <strong> <cite> <code> <ul> <ol> <li> <dl> <dt> <dd>
  • Lines and paragraphs break automatically.
More information about formatting options

Captcha Image: you will need to recognize the text in it.
Please type in the letters/numbers that are shown in the image above.